Camp Projects

Take the TOUR or pick from the list:

Completed Projects

bulletCamper Cabins  
bulletNew Washhouse  
bulletDining Hall Winterizing  
bulletPaving paths with gravel  (for wheelchair access)
bulletArchery/Riflery Range
bulletCaretakers house - kitchen & bathroom

Present Projects

bulletKitchen
bulletOlder remaining cabins
bulletDining Hall Basement
bulletQuad (4-Plex staff housing)
bulletChapel

Future Projects

bulletShop 
(details to be announced)
bulletGround Level Trampoline
A hole will be dug so the olympic sized trampoline can be placed in-ground.
bulletBig Toy
The playground pieces will be set up and suitable ground cover will be put in.
bulletHalf-Court Basketball Pad
A concrete pad will be poured and basket ball hoops will be set up.
bulletRenovation of Caretaker House Upstairs 
(details to follow)

 

 

 
   
 
 
 
 
 

Back to CSSM BC
 
 


Want to help? 

Contact: Ken Lea (Construction Manager)
Email: Ken Lea

 

 

 

 

 

Completed Projects

4 Cabins Renovation (2004 - 2006)

Back to top or Next Project

Four cabins on the one side of camp (in the trees) were gutted and compltely renovated. New windows and doors were installed, the walls were rebuilt and fully insulated. These 4 winterized cabins are now equipped with baseboard heating as well as new bunks and mattresses.  Each cabin was painted inside with a unique mural.

 

 

 

 

 

 

 

Washhouse Winterization (Nov 2005)

Back to top or Next Project

The washhouse was insulated (basement & attic) and the plywood skirt was installed around the outside of the building.

 

  

 

 

 

 

 

 

 

Winterizing Dining Hall / Upstairs completion (Nov 2004)

Back to top or Next Project

Walls were put up between the kitchen and dining area, the dining hall was repainted and trim was installed.

   

 

 

 

 

 

 

 

 

 

 

 

Archery/Riflery Ranges (Summer 2005)

Back to top or Next Project

The archery and riflery rainges were completed for the summer of 2005. These safe shooting areas allow campers to be instructed in our camp skills in using a bows and arrows and pellet guns.

 

 

 

 

 

 

 

 

 

 

Gravel Paths (March 2006)

Back to top or Next Project

          In our effort to include people with disabilities and disadvantages, we have put wheelchair accessible ramps on our buildings.  This includes the newer cabins, washhouse, and dining hall. Gravel paths were spread between the newer cabins and trails for easy wheelchair access.

 

 

 

 

 

 

 

 

Caretaker House - Bathroom & Kitchen Renovation (2006)

Back to top or Next Project

The bathroom and kitchen in the camp caretaker house were completely renovated. Both rooms were dry walled and repainted. Flooring and some equipment in the kitchen was replaced. The trimming and light fixtures were finished and both rooms are now very functional and looking extremely nice.

 

 

 

 

 

 

 

 

 

 

 

 

 

Present Projects

Back to top or Next Project

Kitchen

Currently, we have completed the offices space, pantry, janitorial room and repainting the space. Yet to be completed is the walk-in cooler and freezer and a new range hood and fire suppressions system.


Kitchen food preparation areas


Walk in cooler and freezer

 

 

 

 

 

 

 

Remaining Cabins

Back to top or Next Project

There are four remaining cabins on the other side of camp (beside the field) that we plan to completely renovate with similar objectives as the first four cabins.

 

 

 

 

 

 

 

 

 

Dining Hall Basement

 

Back to top or Next Project

So far we have completed three offices and the laundry room. We have yet to complete the bathrooms, fir-aid station, lounge, program room. The projects require plumbing, electrical and floor coverings installed.

 

 

 

 

 

 

 

 

 

Renovation of the Quad (4-Plex Staff Accommodations)

Back to top or Next Project

A new foundation has been installed, the electrical upgraded with heating, new doors and windows, new roof and deck. The dry walling, painting and trim have yet to be completed.

    


Inside one of the Quad rooms

 

 

 

 

 

 

 

 

Chapel Renovation

Back to top

The 45 year old chapel was elevated and concrete posts and foundations were installed beneath new beams.  12 feet of covered entrance was added to the front of the building, creating a stage for musical and theatrical performances. The front of the chapel has stairs added, and is still wheelchair accessible. A new metal roof was installed and new windows.  The interior of the chapel has been renovated as well with dry-wall, insulation and paint. All that remains is to paint the exterior install the heater.

 
The old chapel (old in corner picture) has been transformed inside and out.


Campers singing in the old chapel. Now its brighter and warmer.


Back to top