Completed Projects
4 Cabins Renovation (2004 - 2006)
Back to top or Next Project
Four cabins on the one side of camp
(in the trees) were gutted and compltely renovated. New windows and
doors were installed, the walls were rebuilt and fully insulated. These 4 winterized cabins are now equipped with baseboard heating as well
as new bunks and mattresses. Each cabin was
painted inside with a unique mural.

Washhouse Winterization
(Nov 2005)
Back to top or Next Project
The washhouse was insulated (basement & attic) and the plywood
skirt was installed around the outside of the building.
Winterizing Dining Hall / Upstairs completion (Nov 2004)
Back to top or Next Project
Walls were put up between the kitchen and dining area, the dining
hall was repainted and trim was installed.
Archery/Riflery Ranges (Summer 2005)
Back to top or Next Project
The archery and riflery rainges were completed for the summer of
2005. These safe shooting areas allow campers to be instructed in our
camp skills in using a bows and arrows and pellet guns.

Gravel Paths (March 2006)
Back to top or Next Project
In our effort to include people with disabilities and disadvantages, we
have put wheelchair accessible ramps on our buildings.
This includes the newer cabins, washhouse, and dining hall. Gravel paths
were spread between the newer cabins and trails for easy wheelchair
access.

Caretaker House - Bathroom & Kitchen Renovation (2006)
Back to top or Next Project
The bathroom and kitchen in the camp caretaker house were completely
renovated. Both rooms were dry walled and repainted. Flooring and some
equipment in the kitchen was replaced. The trimming and light fixtures
were finished and both rooms are now very functional and looking
extremely nice.
Present Projects
Back to top or Next Project
Kitchen
Currently, we have completed the offices space, pantry, janitorial
room and repainting the space. Yet to be completed is the walk-in cooler
and freezer and a new range hood and fire suppressions system.

Kitchen food preparation areas

Walk in cooler and freezer
Remaining Cabins
Back to top or Next Project
There are four remaining cabins on the other side of camp (beside the field)
that we plan to completely renovate with similar objectives as the first four
cabins.

Dining Hall Basement
Back to top or Next Project
So far we have completed three offices and the laundry room. We have yet to
complete the bathrooms, fir-aid station, lounge, program room. The projects
require plumbing, electrical and floor coverings installed.


Renovation of the Quad (4-Plex Staff Accommodations)
Back to top or Next Project
A new foundation has been installed, the electrical
upgraded with heating, new doors and windows, new roof and deck. The dry walling,
painting and trim have yet to be completed.


Inside one of the Quad rooms
Chapel Renovation
Back to top
The 45
year old chapel was elevated and
concrete posts and foundations were installed beneath new beams.
12 feet of covered entrance was added to the front of the building,
creating a stage for musical and theatrical performances. The
front of the chapel has stairs added, and is still wheelchair
accessible. A new metal roof was
installed and new windows. The interior of the
chapel has been renovated as well with dry-wall, insulation and paint. All that
remains is to paint the exterior install the heater.
The old chapel (old in corner picture) has been transformed inside and
out.

Campers singing in the old chapel. Now its brighter and warmer.